Skip to main content
PermitPathLA

Arcadia · Solar permits

Solar permits in Arcadia

How to install a solar in Arcadia: permit pathway through Arcadia Development Services Department, drawings required, local watch-outs, and a free address-level wizard for your Arcadia lot.

Arcadia context

Arcadia's ADU ordinance is in Arcadia Municipal Code Title 9. The city aligns with the California state baseline plus Hillside Standards for slope-affected parcels. Plan check is typically 60 days. The Metro A Line (Gold Line) station at Santa Clara + Wheeler opens up parking-exemption pathways for southern Arcadia parcels.

Permit agency
Arcadia Development Services Department
Median lot size
9,500 sqft

Drawings you'll need to submit

Most LA rooftop solar permits issue same-day via SolarAPP+. We generate the site plan + roof plan + fire setbacks — free.

  • Site plan (parcel layout + setbacks)
  • Roof plan
  • Panel layout diagram
  • Fire-setback diagram (ridges + eaves)
  • Single-line electrical

PermitPathLA generates the site plan free from your Arcadia address. The other drawings come from your architect or plan firm — we list pre-approved options in the wizard.

Arcadia watch-outs for solar

Overlays that hit a meaningful share of Arcadia lots

  • Very High Fire Hazard Severity Zone (VHFHSZ)~28% of parcels

    Northern Arcadia foothill parcels above Foothill Boulevard.

  • Hillside Standards~22% of parcels

    Slopes over 10% trigger geotech + grading limits.

  • Alquist-Priolo (AP) Earthquake Fault Zone proximity~4% of parcels

    Sierra Madre Fault adjacency on the north city edge.

Local quirks

  • Arcadia Unified school fees apply

    Arcadia Unified School District (AUSD) charges school facility fees on ADUs over 500 sqft. AUSD is consistently one of California's highest-ranked public districts — a primary driver of Arcadia home premiums.

  • Hillside foothills need geotech reports

    Lots above Foothill Boulevard typically need a geotechnical / soils engineering report. Budget $3K-$8K and add 4-8 weeks.

  • Santa Anita Park traffic affects construction logistics

    Santa Anita Park race days (and special-event days like the Breeders' Cup) generate significant local traffic. Schedule construction deliveries around race days.

Run your Arcadia address through the wizard

We pull your parcel polygon from county GIS, apply Arcadia ordinance + state baseline rules, generate the site plan, and walk you through the Arcadia Development Services Department submittal. Free, no signup.

Other permits in Arcadia

Solar in nearby cities