Wizard preview — branch only
LADBS ADU pre-submittal check
Encoded from the official LADBS ADU Correction Sheet — the literal categorized list plan check engineers use during review. Toggle the scenario flags below to see how the checklist adapts to different parcel conditions (60 total items in the source dataset).
Scenario flags(preview-only — real wizard pulls these from feasibility output)
Flips ~20 design-side items (egress, interior environment, tempered glazing, structural stamp, Title 24, etc.) from “your designer/engineer handles” to “✓ Covered by pre-approved plan”.
Pre-submittal check
22 / 41 addressed ·
This checklist is derived from the official LADBS ADU Correction Sheet (PC/STR/Corr.Lst.20A1, Rev. 8/03/2021) — the same list plan check engineers use during review. Items we've actually resolved are checked + green; items in the "Coming soon" tier show a pending pill (no checkmark) until the underlying generator ships. Not legal or engineering advice.
5 items
3 items
2 items
8 items
3 items
2 items
6 items
3 items
2 items
3 items