Skip to main content
PermitPathLA

Arcadia · ADU permits

ADU permits in Arcadia

How to build a ADU in Arcadia: permit pathway through Arcadia Development Services Department, drawings required, local watch-outs, and a free address-level wizard for your Arcadia lot.

Arcadia context

Arcadia's ADU ordinance is in Arcadia Municipal Code Title 9. The city aligns with the California state baseline plus Hillside Standards for slope-affected parcels. Plan check is typically 60 days. The Metro A Line (Gold Line) station at Santa Clara + Wheeler opens up parking-exemption pathways for southern Arcadia parcels.

Permit agency
Arcadia Development Services Department
Median lot size
9,500 sqft
ADU permits issued (2025)
291Source: Cal HCD Annual Progress Report 2025 (Table A2, BP_ISSUE_DT1 set)

Arcadia ADU ordinance

Verified against Arcadia Development Services Department's published ordinance on 2026-05-12. State law (CA Government Code §65852.2) overrides any locally-stricter rule.

  • Max detached ADU size

    1,200 sqft (state default)

  • Max ADU height

    16 ft / 18 ft with second-story setbacks

  • Setbacks

    4 ft side / 4 ft rear (state minimum)

  • Hillside Standards

    Apply on slopes over 10%

    Lot-coverage + grading rules. Northern Arcadia foothills.

  • VHFHSZ construction

    Class A roofing + ember-resistant venting + fire-rated assemblies

    Most of north Arcadia.

  • Local processing time

    60 days for flat-lot ADUs; longer for hillside

  • Pre-approved standard plans

    None city-specific

Drawings you'll need to submit

Type your address. See if you can build an ADU, what kind, and exactly how to permit it.

  • Site plan (parcel layout + setbacks)
  • Proposed floor plan
  • Elevations (each side)
  • Title 24 CF1R energy compliance

PermitPathLA generates the site plan free from your Arcadia address. The other drawings come from your architect or plan firm — we list pre-approved options in the wizard.

Arcadia watch-outs for ADU

Overlays that hit a meaningful share of Arcadia lots

  • Very High Fire Hazard Severity Zone (VHFHSZ)~28% of parcels

    Northern Arcadia foothill parcels above Foothill Boulevard.

  • Hillside Standards~22% of parcels

    Slopes over 10% trigger geotech + grading limits.

  • Alquist-Priolo (AP) Earthquake Fault Zone proximity~4% of parcels

    Sierra Madre Fault adjacency on the north city edge.

Local quirks

  • Arcadia Unified school fees apply

    Arcadia Unified School District (AUSD) charges school facility fees on ADUs over 500 sqft. AUSD is consistently one of California's highest-ranked public districts — a primary driver of Arcadia home premiums.

  • Hillside foothills need geotech reports

    Lots above Foothill Boulevard typically need a geotechnical / soils engineering report. Budget $3K-$8K and add 4-8 weeks.

  • Santa Anita Park traffic affects construction logistics

    Santa Anita Park race days (and special-event days like the Breeders' Cup) generate significant local traffic. Schedule construction deliveries around race days.

Run your Arcadia address through the wizard

We pull your parcel polygon from county GIS, apply Arcadia ordinance + state baseline rules, generate the site plan, and walk you through the Arcadia Development Services Department submittal. Free, no signup.

Other permits in Arcadia

ADU in nearby cities