Glendale · ADU permits

ADU permits in Glendale

How to build a ADU in Glendale: permit pathway through Glendale Community Development Department, drawings required, local watch-outs, and a free address-level wizard for your Glendale lot.

Glendale context

Glendale's ADU ordinance lives in Glendale Municipal Code Title 30. The city is geographically split by the 134 freeway: south of the 134 is denser, more walkable, and largely on the flats; north of the 134 climbs into the Verdugo foothills with hillside-area rules. Plan check is typically 45-60 days for ADUs from a complete submittal. The city maintains an online portal for ADU submittals.

Permit agency
Glendale Community Development Department
Median lot size
6,800 sqft
ADU permits issued (2025)
603Source: Cal HCD Annual Progress Report 2025 (Table A2, BP_ISSUE_DT1 set)

Glendale ADU ordinance

Verified against Glendale Community Development Department's published ordinance on 2026-05-12. State law (CA Government Code §65852.2) overrides any locally-stricter rule.

  • Max detached ADU size

    1,200 sqft (state default)

  • Max ADU height

    16 ft / 18 ft with second-story setbacks

  • Setbacks

    4 ft side / 4 ft rear (state minimum)

  • Hillside development standards

    Apply to parcels above Mountain Street

    Slope-based lot-coverage + ridgeline protection rules. Adds geotech / soils review.

  • Adams Hill conservation overlay

    Design review for exterior changes

    Affects a small but significant pocket of architecturally-distinct early-1900s homes east of downtown.

  • Local processing time

    45-60 days for standard ADUs

  • Pre-approved standard plans

    None city-specific

Drawings you'll need to submit

Type your address. See if you can build an ADU, what kind, and exactly how to permit it.

  • Site plan (parcel layout + setbacks)
  • Proposed floor plan
  • Elevations (each side)
  • Title 24 CF1R energy compliance

PermitPathLA generates the site plan free from your Glendale address. The other drawings come from your architect or plan firm — we list pre-approved options in the wizard.

Glendale watch-outs for ADU

Overlays that hit a meaningful share of Glendale lots

  • Very High Fire Hazard Severity Zone (VHFHSZ)~22% of parcels

    Verdugo foothill parcels north of Mountain Street + the Chevy Chase area sit in the VHFHSZ. Chapter 7A construction adds roughly 7% to build cost.

  • Hillside Development Standards (HDS)~28% of parcels

    Slopes over 25% trigger lot-coverage + ridgeline-protection rules + a geotech / soils report. Common combo with VHFHSZ.

  • Adams Hill conservation overlay~4% of parcels

    Small but architecturally-protected pocket east of downtown. Exterior-visible ADUs face design review for compatibility with historic Craftsman / California-bungalow patterns.

Local quirks

  • Verdugo hillside requires a soils report

    If your lot is north of Mountain Street and slopes more than 25%, expect to budget $3,000-$8,000 for a geotechnical / soils engineering report before the building permit issues. Adds 4-8 weeks to your schedule.

  • Glendale Unified school fees apply

    Glendale Unified School District (GUSD) charges school facility fees on new ADUs over 500 sqft, typically around $4.79/sqft.

  • South Glendale walkability supports the transit parking exemption

    Lots in central + south Glendale within 0.5 mi of a major transit corridor (Brand Blvd, Colorado Blvd, the Beeline trunk routes) qualify for the state Accessory Dwelling Unit (ADU) parking exemption. Confirm with Community Development for your specific parcel.

Run your Glendale address through the wizard

We pull your parcel polygon from county GIS, apply Glendale ordinance + state baseline rules, generate the site plan, and walk you through the Glendale Community Development Department submittal. Free, no signup.