How to build a ADU in Glendale: permit pathway through Glendale Community Development Department, drawings required, local watch-outs, and a free address-level wizard for your Glendale lot.
Glendale context
Glendale's ADU ordinance lives in Glendale Municipal Code Title 30. The city is geographically split by the 134 freeway: south of the 134 is denser, more walkable, and largely on the flats; north of the 134 climbs into the Verdugo foothills with hillside-area rules. Plan check is typically 45-60 days for ADUs from a complete submittal. The city maintains an online portal for ADU submittals.
- Permit agency
- Glendale Community Development Department
- Median lot size
- 6,800 sqft
- ADU permits issued (2025)
- 603Source: Cal HCD Annual Progress Report 2025 (Table A2, BP_ISSUE_DT1 set)
Glendale ADU ordinance
Verified against Glendale Community Development Department's published ordinance on 2026-05-12. State law (CA Government Code §65852.2) overrides any locally-stricter rule.
Max detached ADU size
1,200 sqft (state default)
Max ADU height
16 ft / 18 ft with second-story setbacks
Setbacks
4 ft side / 4 ft rear (state minimum)
Hillside development standards
Apply to parcels above Mountain Street
Slope-based lot-coverage + ridgeline protection rules. Adds geotech / soils review.
Adams Hill conservation overlay
Design review for exterior changes
Affects a small but significant pocket of architecturally-distinct early-1900s homes east of downtown.
Local processing time
45-60 days for standard ADUs
Pre-approved standard plans
None city-specific
Drawings you'll need to submit
Type your address. See if you can build an ADU, what kind, and exactly how to permit it.
- Site plan (parcel layout + setbacks)
- Proposed floor plan
- Elevations (each side)
- Title 24 CF1R energy compliance
PermitPathLA generates the site plan free from your Glendale address. The other drawings come from your architect or plan firm — we list pre-approved options in the wizard.
Glendale watch-outs for ADU
Overlays that hit a meaningful share of Glendale lots
Very High Fire Hazard Severity Zone (VHFHSZ)~22% of parcels
Verdugo foothill parcels north of Mountain Street + the Chevy Chase area sit in the VHFHSZ. Chapter 7A construction adds roughly 7% to build cost.
Hillside Development Standards (HDS)~28% of parcels
Slopes over 25% trigger lot-coverage + ridgeline-protection rules + a geotech / soils report. Common combo with VHFHSZ.
Adams Hill conservation overlay~4% of parcels
Small but architecturally-protected pocket east of downtown. Exterior-visible ADUs face design review for compatibility with historic Craftsman / California-bungalow patterns.
Local quirks
Verdugo hillside requires a soils report
If your lot is north of Mountain Street and slopes more than 25%, expect to budget $3,000-$8,000 for a geotechnical / soils engineering report before the building permit issues. Adds 4-8 weeks to your schedule.
Glendale Unified school fees apply
Glendale Unified School District (GUSD) charges school facility fees on new ADUs over 500 sqft, typically around $4.79/sqft.
South Glendale walkability supports the transit parking exemption
Lots in central + south Glendale within 0.5 mi of a major transit corridor (Brand Blvd, Colorado Blvd, the Beeline trunk routes) qualify for the state Accessory Dwelling Unit (ADU) parking exemption. Confirm with Community Development for your specific parcel.
Run your Glendale address through the wizard