ADU permits in Burbank

How to build a ADU in Burbank: permit pathway through Burbank Community Development Department, drawings required, local watch-outs, and a free address-level wizard for your Burbank lot.

Burbank context

Burbank's ADU ordinance is implemented through Burbank Municipal Code Title 10 and is largely state-baseline. Plan check is typically faster than LADBS — homeowners often see 30-45 days for a complete submittal. The big local quirks are airport-noise-zone construction requirements on parcels under the BUR flight path and Very High Fire Hazard Severity Zone (VHFHSZ) rules on the northern Verdugo foothills.

Permit agency
Burbank Community Development Department
Median lot size
6,200 sqft
ADU permits issued (2025)
233Source: Cal HCD Annual Progress Report 2025 (Table A2, BP_ISSUE_DT1 set)

Burbank ADU ordinance

Verified against Burbank Community Development Department's published ordinance on 2026-05-12. State law (CA Government Code §65852.2) overrides any locally-stricter rule.

  • Max detached ADU size

    1,200 sqft (state default)

  • Max ADU height

    16 ft / 18 ft with second-story setbacks

  • Setbacks

    4 ft side / 4 ft rear (state minimum)

  • Airport-influence area construction

    Sound-attenuation rules on parcels under the BUR flight path

    Mostly affects southern + central Burbank. Adds STC-rated windows + insulation upgrades.

  • Local processing time

    30-45 days typical (faster than state-mandated 60)

  • Pre-approved standard plans

    None city-specific — uses HCD-prefab + custom designer plans

Drawings you'll need to submit

Type your address. See if you can build an ADU, what kind, and exactly how to permit it.

  • Site plan (parcel layout + setbacks)
  • Proposed floor plan
  • Elevations (each side)
  • Title 24 CF1R energy compliance

PermitPathLA generates the site plan free from your Burbank address. The other drawings come from your architect or plan firm — we list pre-approved options in the wizard.

Burbank watch-outs for ADU

Overlays that hit a meaningful share of Burbank lots

  • BUR Airport-Influence Area~55% of parcels

    Parcels under the BUR flight path require sound-attenuation construction (STC-rated windows, upgraded insulation). Affects a wide swath of southern + central Burbank. Adds modest cost, not timeline.

  • Very High Fire Hazard Severity Zone (VHFHSZ)~15% of parcels

    Northern Verdugo foothills hit the VHFHSZ. Triggers Chapter 7A construction (Class A roofing, ember-resistant venting) — adds roughly 7% to construction cost.

Local quirks

  • Airport-noise construction is real if you're south of Glenoaks

    Burbank's Airport-Influence Area covers a wide southern + central swath. Plans require sound-attenuation details that LADBS doesn't ask for. Don't reuse a Studio City designer's stock ADU plans verbatim; the window assemblies usually need upgrading.

  • Burbank Unified school fees apply

    Burbank Unified School District (BUSD) charges school facility fees on ADUs over 500 sqft. Currently around $4.79/sqft — a 900 sqft ADU adds roughly $4,300.

  • Plan check is faster than LADBS — don't expect LA City timelines

    Many Burbank ADUs clear plan check in 30-45 days for a complete submittal. If your contractor quotes a 6-month timeline citing LADBS averages, push back. The constraint here is usually contractor availability, not the city.

Run your Burbank address through the wizard

We pull your parcel polygon from county GIS, apply Burbank ordinance + state baseline rules, generate the site plan, and walk you through the Burbank Community Development Department submittal. Free, no signup.