Skip to main content
PermitPathLA

Same zip, different jurisdiction: this page covers LA County Public Works (DPW). The same zip code(s) also cover parts of Hawthorne (Hawthorne (its own permits)). Verify your parcel's jurisdiction before filing, different agencies, different rules.

South Bay · LA County (Unincorporated)

ADU permits in Del Rey Island

Zip codes:90250

Del Rey Island is a small unincorporated 'island' community of about 1,500 people in the South Bay, surrounded by the City of Hawthorne. It is not a city. Building permits run through Los Angeles County Public Works (Building & Safety), not Hawthorne city's department. The term 'island' refers to the unincorporated parcel completely enclosed by an incorporated city, a common LA County jurisdictional quirk.

Unincorporated LA County, not LADBS

Del Rey Island is unincorporated territory. Building permits go through LA County Public Works (Building & Safety) under LA County Code Title 22, not the Los Angeles Department of Building and Safety (LADBS). Our address checker pulls real feasibility data for any LA County address; the Del Rey Island-specific permit pathway is detailed below.

Del Rey Island by the numbers

Rounded figures from the 2020 US Census, LA County Assessor parcel data, and LA County DPW permit records.

Population

1,500

2020 Census

Single-family homes

~420

LA County Assessor

Median lot size

5,200 sqft

Approximate

What makes Del Rey Island different

Del Rey Island is one of LA County's classic 'unincorporated islands', completely surrounded by an incorporated city (Hawthorne) but legally separate. Permits run through LA County DPW Building & Safety. Surrounded by LAX flight paths.

LA County ADU rules for Del Rey Island

Last verified: 2026-04-15

Current LA County rules from Title 22 of the County Code, as applied to Del Rey Island. State preemption (Gov Code §§ 66310-66342) means the county can't reduce below the state baseline. We note where that applies.

Max detached ADU size

1,200 sqft (state default)

Max ADU height

16 ft / 18 ft with second-story setbacks

Setbacks

4 ft side / 4 ft rear (state minimum)

Permitting agency

LA County Public Works (Building & Safety)

Local processing time

60 days from complete submittal (state-mandated)

Source: LA County Public Works (Building & Safety)

Active overlays + extra rules in Del Rey Island

LA County overlays + state-level designations that hit a meaningful share of Del Rey Island parcels.

LAX Airport-Influence Area

~100% of parcels

Surrounded by LAX flight paths. Sound-attenuation construction required.

Watch-outs specific to Del Rey Island

  1. 01

    'Island' jurisdiction, surrounded by Hawthorne but LA County

    Del Rey Island is completely surrounded by Hawthorne city but is itself unincorporated LA County. Verify jurisdiction at the Assessor parcel lookup before filing.

  2. 02

    LAX flight noise is significant

    Sound-attenuation construction (STC-rated windows + insulation) is required.

Need a person, not a wizard?

Routes that fit Del Rey Island

Based on what we know about Del Rey Island, these are the lead types that usually make sense here. Pick whichever fits your situation. All free, no obligation.

Complex permit context

Request a Del Rey Island permit referral

Coastal, hillside, historic, fire-zone, or multi-overlay parcels in Del Rey Island usually mean a permit expediter pays for itself in saved months. We work with affiliated Los Angeles permit expediters and expeditors (both spellings) who've handled Del Rey Island projects.

Permit types I'm thinking about

We don't sell your details. No obligation, no fee from us.

Amenities + civic services in Del Rey Island

Parks, libraries, and the school district that serve the area. Context that matters for renter appeal, family relocation, and long-term resale.

Public schools

School assignments vary by exact address. Performance levels below are from the official California School Dashboard, California's official accountability system uses colored levels (blue highest, red lowest) rather than 1-10 numeric scores.

District

Hawthorne School District + Centinela Valley Union High School District

Getting around Del Rey Island

Bus-served suburban.

Transit + walkability

Bus lines

  • Metro 215
  • Torrance Transit

Walkability

Moderately walkable along major boulevards.

Nearby airports

Distance + type for each major Los Angeles-area airport reachable from Del Rey Island. Useful for travel, commute, and any flight-path noise concerns on specific parcels.

  • Los Angeles International (LAX)

    ~3 mi

    International

    Directly under LAX flight paths.

  • Hawthorne Municipal (HHR)

    ~1 mi

    General aviation

Frequently asked questions about Del Rey Island ADUs

Can I build an ADU in Del Rey Island?

Yes. Del Rey Island allows ADUs under LA County Code Title 22, aligned with California Gov Code §§ 66310-66342. Most single-family lots can host one ADU plus one JADU. Permits go through LA County Public Works (Building & Safety), not LADBS, since Del Rey Island is unincorporated territory rather than a city.

Why does Del Rey Island use LA County rules instead of LA City rules?

Del Rey Island is unincorporated. It's never been formally incorporated as its own city, so LA County serves as the local government. Building permits, zoning, sheriff, libraries (in many cases), and most other services run through county departments rather than city ones.

Where do I submit my Del Rey Island ADU permit?

Online via LA County's EPIC-LA portal, or in-person at the LA County Public Works Building & Safety counter in Alhambra (900 S. Fremont Avenue). The EPIC-LA online portal handles most ADU submittals end-to-end, so you rarely need to visit in person.

How long does the ADU permit process take in Del Rey Island?

LA County DPW targets the state-required 60-day plan check for ADUs from a complete submittal. Hillside, VHFHSZ, or environmental-review parcels can extend timelines by 4 to 12 weeks. Del Rey Island-specific overlays may add additional time. See the watch-outs above.

Are LA County's pre-approved ADU plans free?

Yes. LA County maintains three pre-approved standard ADU plans (Plans A, B, and C) usable in any unincorporated area, including Del Rey Island. They're free to use, similar to LADBS's YOU-ADU program. The trade-off is reduced design flexibility, but for a fast, low-cost permit path they're the strongest option.

Ready to see what your Del Rey Island lot can do?

Our free address checker pulls real zoning, overlay, and parcel data for any Los Angeles County address, including unincorporated Del Rey Island. Start there and we'll surface what applies to your specific lot.

Check your address →

Reviewed by , Founder, PermitPathLA. California DRE-licensed broker with 30+ years of Los Angeles real estate and mortgage industry experience.

Del Rey Island ordinance data last reviewed .

See an error or stale rule? corrections@permitpath.la

Primary sources: LA County DPW ADU info · LA County Code Title 22