ADU permits in Stevenson Ranch

How to build a ADU in Stevenson Ranch: permit pathway through LA County Public Works (Building & Safety), drawings required, local watch-outs, and a free address-level wizard for your Stevenson Ranch lot.

Stevenson Ranch context

Stevenson Ranch is unincorporated despite immediately adjoining Santa Clarita city limits. Permits run through LA County DPW Building & Safety at the Santa Clarita field office via EPIC-LA. Most parcels are inside master-association HOAs that layer architectural review on top of LA County's permit process. Western foothill parcels sit in the Very High Fire Hazard Severity Zone (VHFHSZ), Chapter 7A construction required.

Permit agency
LA County Public Works (Building & Safety)
Median lot size
7,400 sqft
ADU permits issued (2025)
61Source: HCD 2025 total (1,278) distributed proportionally across 2024 per-area shares. 2024: 70.

Stevenson Ranch ADU ordinance

Verified against LA County Public Works (Building & Safety)'s published ordinance on 2026-04-15. State law (CA Government Code §§ 66310-66342) overrides any locally-stricter rule.

  • Max detached ADU size

    1,200 sqft (state default)

  • Max ADU height

    16 ft / 18 ft with second-story setbacks

  • Setbacks

    4 ft side / 4 ft rear (state minimum)

  • Permitting agency

    LA County Public Works (Building & Safety), Santa Clarita field office

    Not Santa Clarita city. EPIC-LA portal.

  • Fire-hazard construction

    Chapter 7A required on VHFHSZ parcels (western foothills)

  • Local processing time

    60 days from complete submittal (state-mandated)

Drawings you'll need to submit

Type your address. See if you can build an ADU, what kind, and exactly how to permit it.

  • Site plan (parcel layout + setbacks)
  • Proposed floor plan
  • Elevations (each side)
  • Title 24 CF1R energy compliance

PermitPathLA generates the site plan free from your Stevenson Ranch address. The other drawings come from your architect or plan firm, we list pre-approved options in the wizard.

Stevenson Ranch watch-outs for ADU

Overlays that hit a meaningful share of Stevenson Ranch lots

  • Very High Fire Hazard Severity Zone (VHFHSZ)~35% of parcels

    Western foothill parcels. Chapter 7A construction + defensible space at final.

  • Master-association HOA architectural review~85% of parcels

    Most parcels in master-association HOAs with architectural review on exterior changes.

Local quirks

  • HOA architectural review is layered on top of LA County permits

    Almost every Stevenson Ranch parcel is in a master-association HOA. The HOA's architectural review layers on top of LA County's permit process. Get HOA scoping done before drafting plans.

  • Don't file with Santa Clarita city, it's LA County

    Stevenson Ranch residents often default to Santa Clarita city for permits, then have to restart with LA County. Verify your parcel's jurisdiction.

  • Six Flags Magic Mountain rental-market context

    Six Flags Magic Mountain is immediately west of Stevenson Ranch. Short-term rental (STR) ADU economics here are stronger than mid-SCV averages, but most master-association HOAs prohibit STRs. Verify CC&Rs.

Run your Stevenson Ranch address through the wizard

We pull your parcel polygon from county GIS, apply Stevenson Ranch ordinance + state baseline rules, generate the site plan, and walk you through the LA County Public Works (Building & Safety) submittal. Free, no signup.

Other permits in Stevenson Ranch